[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"1bf1j0q":3,"112dnss":111},{"common":4,"navPages":23,"productGroups":41,"seo":104,"strategies":110},{"_id":5,"_type":5,"cta_label":6,"cta_label_impact":7,"cta_url":8,"email":9,"socials":10},"settings_common","go to sphere-energy","read impact studies","https:\u002F\u002Fsphere-energy.eu\u002F",null,[11,15,19],{"_key":12,"label":13,"type":13,"url":14},"668f9a890fd5","linkedin","https:\u002F\u002Fwww.linkedin.com\u002Fcompany\u002Fsphere-energy\u002F",{"_key":16,"label":17,"type":17,"url":18},"5a142892073b","medium","https:\u002F\u002Fmedium.com\u002F@lutz.lukas88",{"_key":20,"label":21,"type":21,"url":22},"f97a157c8bf7","youtube","https:\u002F\u002Fwww.youtube.com\u002F@SphereEnergy",[24,28,32,35,38],{"_id":25,"slug":26,"title":27},"8b8dc55d-3fef-48a3-8152-48bcedea3bf6","studies","impact studies",{"_id":29,"slug":30,"title":31},"d8a818b7-6dc3-4fca-9486-d49e219c200e","insights-and-podcast","insights",{"_id":33,"slug":34,"title":34},"15dbbb59-c8d8-46d2-bd7c-722ffe763ccf","about",{"_id":36,"slug":37,"title":37},"e51b289d-7622-4849-a702-aacc482d6a56","careers",{"_id":39,"slug":40,"title":40},"d529968f-1fdb-40a0-8c9d-f6e1ff64ef9f","vetta",[42,95],{"_id":43,"products":44,"subgroups":45,"title":94},"f62d95db-3849-497c-aced-e4224dc82287",[],[46,58,74,86],{"_id":47,"products":48,"title":57},"0e0c2eda-4ebb-4655-9682-36dd99eee188",[49,53],{"_id":50,"slug":51,"title":52},"26365138-af07-43a8-b1f5-8b8539034357","system-requirements","system requirements",{"_id":54,"slug":55,"title":56},"60bd35d9-8e30-4d83-ad89-daec1e1402fa","rfq-extraction","RfQ extraction","requirements engine",{"_id":59,"products":60,"title":73},"c74e91e7-c9ee-403c-8adb-20c28a5cfd2a",[61,65,69],{"_id":62,"slug":63,"title":64},"4ced5d43-05fd-4d4a-9fe2-d35d3c237c08","variant-management","variant management",{"_id":66,"slug":67,"title":68},"266439e9-8a70-4a8d-a99b-fb4fafec1d31","cad-workflow-automation","CAD workflow automation",{"_id":70,"slug":71,"title":72},"4f2e91c5-6108-4e04-a1c7-db856024d967","feature-extraction-and-costing","feature extraction & costing","cad design",{"_id":75,"products":76,"title":85},"d690aa9f-ce2d-4cf2-b96e-d3a39c414964",[77,81],{"_id":78,"slug":79,"title":80},"1195c7c7-3b7d-4adb-9060-cb8c57210604","fem-surrogate-simulation","FEM surrogate simulation ",{"_id":82,"slug":83,"title":84},"d78ab96c-bc60-4a64-850a-08c254c79ebe","anomaly-detection","anomaly detection","crash simulation",{"_id":87,"products":88,"title":93},"ee6c78d7-c3f4-4238-b8f0-3654895fcf2c",[89],{"_id":90,"slug":91,"title":92},"c650bee1-62eb-4dcd-a3b0-f4e490331f67","wvta","WVTA","homologation hub","engineering AI",{"_id":96,"products":97,"subgroups":102,"title":103},"865c3cc9-1bd1-4eb7-9b45-997456c72b35",[98],{"_id":99,"slug":100,"title":101},"6686f4ea-e714-4b10-a0a4-3704512abc31","https:\u002F\u002Fwww.sphere-energy.eu\u002F","battery AI solutions",[],"battery AI",{"description":105,"og_description":106,"og_image":107,"og_title":108,"title":109},"Sphere builds Vetta, an AI operating system for physical product development. It unifies engineering data, orchestrates AI models and supports workflows across the entire product lifecycle.","Vetta is the AI operating system for physical product development, helping engineering teams connect data, models and workflows across the full development lifecycle.","https:\u002F\u002Fcdn.sanity.io\u002Fimages\u002Fowk14ohd\u002Fproduction\u002Fa750d9adc1a676399bfcb13d2eee377f5583c9de-1200x630.jpg","Sphere | AI Operating System for Physical Product Development","Sphere Intelligence",[],{"_id":112,"_type":113,"content":114,"customerProfile":221,"groups":222,"image":226,"plainTitle":233,"relatedStudies":234,"seo":9,"slug":315,"subtitle":316,"title":317},"3af6e18c-af76-4438-ba61-265b9b76c1a9","study",[115,127,136,144,152,160,168,176,184,192,200],{"_key":116,"_type":117,"children":118,"markDefs":125,"style":126},"8a2f93ea1bb0","block",[119],{"_key":120,"_type":121,"marks":122,"text":124},"4b9f83ccb84e","span",[123],"strong","The situation",[],"h2",{"_key":128,"_type":117,"children":129,"markDefs":134,"style":135},"aae980737426",[130],{"_key":131,"_type":121,"marks":132,"text":133},"0cf9ac9467b8",[123],"Your planners are making critical scheduling decisions before the full operational picture exists.",[],"normal",{"_key":137,"_type":117,"children":138,"markDefs":143,"style":135},"c584315f78e5",[139],{"_key":140,"_type":121,"marks":141,"text":142},"b9301f04ead3",[],"Supply chain planning required coordinating hundreds of complex SKUs across completely isolated production islands. Every month, planning teams spent 2 to 5 days manually building operational schedules in spreadsheets before production could begin. Operating in functional silos left planners with zero bandwidth to simulate scenarios or adapt to operational shifts.",[],{"_key":145,"_type":117,"children":146,"markDefs":151,"style":126},"c93fc7b8b1f1",[147],{"_key":148,"_type":121,"marks":149,"text":150},"cf97d7fe3bb8",[123],"The approach",[],{"_key":153,"_type":117,"children":154,"markDefs":159,"style":135},"a7c7b6e95052",[155],{"_key":156,"_type":121,"marks":157,"text":158},"140a7e78fb62",[123],"A unified optimization engine built natively on live SAP data.",[],{"_key":161,"_type":117,"children":162,"markDefs":167,"style":135},"cf359382c78b",[163],{"_key":164,"_type":121,"marks":165,"text":166},"b31bf3fb5cbe",[],"Sphere deployed Sphere Optimizer directly on top of the client's existing SAP infrastructure, instantly bridging isolated production islands without replacing enterprise software. By connecting directly into live SAP data streams, the optimizer creates a single source of truth across all facilities.",[],{"_key":169,"_type":117,"children":170,"markDefs":175,"style":135},"f57256b2edb4",[171],{"_key":172,"_type":121,"marks":173,"text":174},"1135f66b7db0",[],"Planners set custom optimization constraints, such as throughput, machine availability, or delivery deadlines and run multi-scenario simulations in real time. Sphere Optimizer then automatically generates all operational plots, performance charts, and departmental reports needed for execution.",[],{"_key":177,"_type":117,"children":178,"markDefs":183,"style":135},"0d16b219f0c6",[179],{"_key":180,"_type":121,"marks":181,"text":182},"e708ace743fd",[123],"What changes for the planner",[],{"_key":185,"_type":117,"children":186,"markDefs":191,"style":135},"38bd88ef9568",[187],{"_key":188,"_type":121,"marks":189,"text":190},"7c8476c2402e",[],"Instead of spending up to a week manually organizing spreadsheets across disconnected units, planners simply define operational priorities, run instant scenario simulations, and deploy the optimal path. Automated reporting eliminates routine administrative tasks, giving planners complete cross-site visibility and immediate agility when conditions shift.",[],{"_key":193,"_type":117,"children":194,"markDefs":199,"style":126},"c27cf8ca69dc",[195],{"_key":196,"_type":121,"marks":197,"text":198},"524f5df5861f",[123],"Measurable impact",[],{"_key":201,"_type":202,"items":203},"7b619bfaefd6","cardsSmall",[204,209,213,217],{"_key":205,"_type":206,"description":207,"title":208},"ce39970ebca9","card","in monthly planning time (from 5 days to minutes)",">95% reduction",{"_key":210,"_type":206,"description":211,"title":212},"856b7631fce7","report generation and operational plot creation","100% automated",{"_key":214,"_type":206,"description":215,"title":216},"0c3f60f8ab15","multi-scenario simulation capabilities across all production lines","Real-time",{"_key":218,"_type":206,"description":219,"title":220},"2bb373a345fe","with existing enterprise SAP data streams","Seamless native integration","Industry\nSupply Chain & Industrial Manufacturing\n\nApplications\nSales & Operations Planning (S&OP) & Production Scheduling\n\nOperations\nMulti-Site Production & High-SKU Portfolio\n\nDeployment\nSphere Optimizer (Native SAP Integration)",[223],{"_id":224,"slug":225,"title":225},"f9c33765-ee11-4ff9-9195-90876cbb1ac4","powertool",{"_type":227,"image":228},"imageAlt",{"_type":229,"asset":230},"image",{"_ref":231,"_type":232},"image-5daef95632e1bc6891eb2472bb470038a4de7772-2048x1365-png","reference","Native SAP S&OP Optimization for Multi-Site Manufacturing",[235,256,284],{"_id":236,"card_subtitle":237,"groups":238,"image":242,"plainTitle":246,"slug":247,"title":248},"04421785-f726-4f90-9288-2c9365c27188","Automotive Safety Engineering",[239],{"_id":240,"slug":241,"title":241},"9f7b94d8-4ca6-4d47-a3e8-0a8cadb005d6","automotive",{"_type":227,"image":243},{"_type":229,"asset":244},{"_ref":245,"_type":232},"image-0701970d50c01681b44af39ffefa3ed03c1038c4-2048x1365-png","Physics-Inspired AI Crash Simulation for Automotive Safety Engineering","physics-inspired-ai-crash-simulation-for-automotive-safety-engineering",[249],{"_key":250,"_type":117,"children":251,"markDefs":255,"style":135},"db6e5d552d58",[252],{"_key":253,"_type":121,"marks":254,"text":246},"f65720d31f2f",[],[],{"_id":257,"card_subtitle":258,"groups":259,"image":261,"plainTitle":265,"slug":266,"title":267},"509b1daf-911d-41e4-a5b7-8b9c305d2bcf","Leading Global Manufacturer",[260],{"_id":240,"slug":241,"title":241},{"_type":227,"image":262},{"_type":229,"asset":263},{"_ref":264,"_type":232},"image-f48458db7a34ca1dec2ca8ef17bba3cebd4e62e5-2048x1365-png","Requirements Engineering:\n\nFrom Requirements to Manufacturing Costs","from-months-to-minutes-an-ai-driven-battery-pack-design-assistant",[268,276],{"_key":269,"_type":117,"children":270,"markDefs":275,"style":135},"47ef42df8830",[271],{"_key":272,"_type":121,"marks":273,"text":274},"f4d185c5fb1d",[],"Requirements Engineering:",[],{"_key":277,"_type":117,"children":278,"markDefs":283,"style":135},"6d2f6ece9bda",[279],{"_key":280,"_type":121,"marks":281,"text":282},"e9ad16c51a4e",[],"From Requirements to Manufacturing Costs",[],{"_id":285,"card_subtitle":286,"groups":287,"image":292,"plainTitle":296,"slug":297,"title":298},"eb74791e-a917-4c32-ba1b-65005c773e3d","Leading Global Automotive OEM",[288,289],{"_id":240,"slug":241,"title":241},{"_id":290,"slug":291,"title":291},"4c6b3c1b-d4a0-42f5-8505-b4ee4cc224fa","energy",{"_type":227,"image":293},{"_type":229,"asset":294},{"_ref":295,"_type":232},"image-c5abf5ed0e02fffd9b5127c883c2b6f4acb2a945-2048x1365-png","From Months to Days:\n\nAI Powered Bttery Validation","from-months-to-days-ai-predicted-battery-cell-end-of-life",[299,307],{"_key":300,"_type":117,"children":301,"markDefs":306,"style":135},"f9cd36076189",[302],{"_key":303,"_type":121,"marks":304,"text":305},"a6603a34267e",[],"From Months to Days:",[],{"_key":308,"_type":117,"children":309,"markDefs":314,"style":135},"aa997278e829",[310],{"_key":311,"_type":121,"marks":312,"text":313},"c8da84e83219",[],"AI Powered Bttery Validation",[],"native-sap-s-and-op-optimization-for-multi-site-manufacturing","Global industrial manufacturer automating multi-site supply chain planning and real-time scenario modeling directly on native SAP infrastructure.",[318],{"_key":319,"_type":117,"children":320,"markDefs":324,"style":135},"51e34c8b4ed8",[321],{"_key":322,"_type":121,"marks":323,"text":233},"2ce1d4779415",[],[]]